Home Uncategorized STILL THERE DEERFIELD BEACH’S FOLLY FLOATING ASHORE BARGE AND TUG BOAT STILL...

STILL THERE DEERFIELD BEACH’S FOLLY FLOATING ASHORE BARGE AND TUG BOAT STILL STRANDED

104
0

Deerfield-News.com-Deerfield Beach, Fl-The $335,000 dollar DFB reef project is still stuck in the sand. Deerfield beach spokeswoman Rebecca median start again stating the responsibility for completion and removal of the barge and boat lie with the contractor. That said Deerfield Beach residents are growing impatient with the second Deerfield Beach reef project with a failure in 2015 as well. Since Wednesday Deerfield Beach has been saying the contractor will move the items and complete the reef.

Some may feel it necessary to go to the city of Deerfield Beach’s Facebook “beach survey” and list the removal of the stranded boat and barge and reef completion as something we must complete.